One of the Challenges in complying with a Consent Decree so focused on reparing underground defects is that you often overlook infrastructure invemsnet that is taring you in the face. Rather than contiue forward with another massive invesment to repair unde

Critical Infrastructure Priority Projects

IDProjectDescriptionDesignerBudgetStage Gate
1CWP-01Wallace Interceptor at Boggy BayouAFJMC$3,000,000 Detailed Design
2CWP-02North Pierre Lift Station Roof RepairKSA$73,700 Post-Construction
3CWP-03Stoner Lift Station Emergency RepairBalar Associates$1,475,000 Construction
4CWP-04Amiss Ozone ImprovementsBurns and McDonnell$36,500,000 Bid & Award
5CWP-05North Regional WWTP- Levee Repair #2Coyle Engineering$200,000 Preliminary Design
6CWP-06Southern Trace Lift StationBKI$300,000 Bid & Award
7CWP-07North Regional WWTP-Levee Repair #1Coyle Engineering$157,192 Bid & Award
8CWP-08City Wide Point RepairTBD$15,000,000 Preliminary Design
9CWP-09Lucas and North Field WWTP ImprovementsBalar Associates$6,850,000 Alternatives
10CWP-10Public Landing Lift Station ImprovementsRaley & Associates$700,000 Bid & Award
11CWP-11Stratmore Lift Station RehabilitationHalff Associates$700,000 Preliminary Design
12CWP-12Lift Station Rehabilitation PackageBKI$13,000,000 Conceptual Design
13CWP-14Sludge Farm FacilityKSA$3,703,000 Detailed Design
14CWP-15Golf Link Drive SewerCity of Shreveport$312,000 Post- Construction
15CWP-16719 Edwards Sewer Main RehabilitationTBDTBDAlternatives
16CWP-17Exposed Sewer Mains in Bayou Pierre (Business Park)KSA$650,000 Conceptual Design
17CWP-35McNeil Slope Stability ImprovementsTBDTBDScoping
18CWP-36City Wide Inflow ProtectorsTBDTBDScoping
19CWP-37Caddo Bossier Port Point RepairTBD$720,000 Scoping